Our Clients

Commercial/Office Projects

Ref Project Client Value Programme Scope of Works Status Contact
224 Finsbury Circus, EC2 Bovis Lend Lease £1.86M Jul 05-Jun 08 Office Refurbishment, Joinery Works & Windows Completed Andy Leigh - Project Manager, Philkinson - Quantity Surveyor
228 Tooley Street, EC1 Crisp Interiors £171K Apr 06-Aug 06 Joinery & Builderswork Completed Steve Simmons - Project Manager; Michaela Mc George - Quanity Surveyor
232 Wood Street, EC2 Bovis Lend Lease £585K Jun 06-Jul 07 Office Refurbishment - Doors Ironmongery etc. Completed Phil Clarke/Russell Bond - Project Managers
233 International House, WC2 Como Construction £491K Jul 06-Feb 07 Carpentry, Joinery, Toilet Fit Out & Raised Floors Completed Chris Emmett - Project Manager; Peter Hill - Quantity Surveyor
239 REISS Headquarters, W1 Como Construction £83K Jun 07-Sep 07 Structural Timber Completed Andrew Wilson - Project Manager; Adrian Yong - Quantity Surveyor
243 7-10 Old Bailey, EC4 Bowen plc £900K Aug 08-Jan 09 Joinery & Toilet Fit Out Completed Peter Jenkins - Project Manager; Kate Collins - Quantity Surveyor
242 Kingsgate House, Redhill Bowmer & Kirkland £320K Feb 08-Dec 08 Doors, Frame and General Joinery Completed David Langlands - Project Manager; Peri Zagaretos - Quantity Surveyor
247 The Strand, WC2 Redwing Construction  £74K Jul 08-Sep 08 Joinery, Door Installation, WC Fit Out & Ancillary Carpentry Works Completed David Torrel - Project Manager; Steve Barnham - Quantity Surveyor
248 Museum of Garden History, SE1 Redwing Construction £82K Jul 08-Sep 08 Joinery Works Completed David Torrel - Project Manager; Steve Barnham - Quantity Surveyor
244 Fenchurch Street, EC3 Mace Plus £1.03M Sep 08-Mar 09 Toilet Fit Out & Joinery Completed Drren King - Project Manager; Shaun Grazette - Quantity Surveyor
254 Gracechurch Street, EC2 Costain £85K Aug 09-Oct 09 Masard Roof and Timber Dormers Completed Mark Sowerby - Project Manager; Lee Morrissey - Package Quantity Surveyor
266 Syon Park Hotel, Middlesex Bowen £890K Sep 09-Mar 11 Carpentry Joinery & Cladding to Hotel Link Bridge, Fit Out Completed David Goward - Project Manager; Joe Raj - Quantity Surveyor
273 Crawley Galliford Try £435K May 11-Jun 12 Joinery, Door Installation, WC Fit Out & Ancillary Carpentry Works Completed David Goward - Project Manager
301 BSkyB - Fitness Centre Mace £410K Mar 15- July 15 Internal Joinery, Metal Work, WC and Shower Cubicles, IPS Panelling and Cycle Racks Completed Carl Barr - Project Manager; John Hedden - Quantity Surveyor
306 Jermyn Street Szerelmey £188k Sep 15 - Jan 16 Complete refurbishment of existing roof Completed Tuffin Ferraby Taylor - Construction Consultant
307 London Wall Brookfield Multiplex £1.2m April 16 - Joinery, Ironmongery, Signage - Design & Build Ongoing Aidan Lucas - Project Manager; Antony McSharry - Project Surveyor
308 Basingstoke Police Investigation Centre Mace Group £1.0m June 16 - Dec 16 Internal Doors, Skirting, Window Boards and Washroom Fit-Out Completed Andrew Palmer - Project Manager; Simon Griffith - Project Surveyor

Education Projects

Ref Project Client Value Programme Scope of Works Status Contact
141 Royal Academy of Dramatic Arts, London Laing £824K 2000 Carpentry, Joinery, Doors, Wood Flooring and Panelling Completed Brian Wolding - Quantity Surveyor
153 Millennium School & Health Centre, Greenwich, SE10 Wates Const £351K 2001 External Timber Cladding Completed Andy Wall; Nigel Smith
181 Priors Court School The Andrews Partnership £141K 2001-2002 General Refurbishment of the Early Years Centre(2 no. Buildings) Completed Laura Brampton
189 Charterhouse School Godalming, Surrey GTCM £227K Jul 02-Sep 02 Joinery Refurbishment of Dormitary's Completed Andrew Healey - Quantity Surveyor
230 John Madejski Academy, Reading Costain £716K Jul 06-Jan 07 Doors, Frame and General Joinery Completed Richard Tranter - Project Manager; Alan Kittles - Quantity Surveyor
253 Teddington Secondary School Mace Plus £1.32M Jul 09-Aug 10 Kerto Roofing, General Joinery and WC Fit Out Completed John Fraser - Project Manager Liam Donoher - Quantity Surveyor
256 Wren Academy Galliford Try £428K Jul 09-Sep 10 General Joinery and External Timber Cladding Completed Vince Sherwin - Project Manager Andrew Every - Quantity Surveyor
262 Garth Hill College Mace Plus £1.2M Oct 09-Sep 10 Doors, Joinery, Screens Windows and Tiling Completed Alistar Kendall - Project Manager, Ryan King - Quantity Surveyor
263 Sainsbury Laboratory Kier/Cambridge University £1.7M Mar 10-Feb 11 Timber/Metal Door Sets, Joinery, Panelling Completed Nick Mann - Project Manager; Iain Cox - Quantity Surveyor
265 OMPI (Oxford Molecular Pathology Institute) Mace Plus £450K Aug 10-Dec 10 Doors, WC fitout, Cedar furniture Completed Phil Hilton - Project Manager, Tom Hunter Quantity Surveyor
270 University of Hartfordshire (Hatfield) ISG £210K Feb 11-Jul 11 Doors, Acoustic Wall Panels, general Joinery Completed James Barbwell - Project Manager, Michael Dempsey Quantity Surveyor
275 Waltham Forest Mace Plus £2.2M Jul 11-Sep 11 General refurbishment of 4 separate school buildings Completed Andrew Palmer - Project Manager, Lance Lucas - Quantity Surveyor
278 Southfields Community College 1st Phase Lend Lease £400K Jul 12 - Jan 13 Doors, glazed screens, desks,display cabinets, seats Completed Roger Hirst - Project Director
282 Southfields Community College 2nd Phase Lend Lease £330K Jul 13 - Feb 14
Doors, glazed screens, desks, display cabinets, seats Completed Roger Hirst - Project Director
285 Barnet Schools Phase 1
Mace Plus £730K Jul 13- Aug 13
M&E, roofing, plastering, flooring, ceilings, partitions, door sets, cubicles, wall tiles and decoration Completed
288
Barnet Schools Phase 2-5
Mace Plus
£717k
Dec 13- Apr 14
Carpentry & Joinery
Completed
Ian Thomas - Project Manager, Liam Donoher - Quantity Surveyor
296 ARK Academy
Lend Lease £575K Nov 14- July 15
Internal Joinery and Tiling Completed John Fifield - Project Manager, Max Atkinson - Quantity Surveyor
298
St John Bosco College
Lend Lease
£485k
Nov 14-Sep 15
Cedar Cladding to Sports Hall Curved Timber Chapel Wall and Internal Joinery Completed John Trainer
299 Marlborough Interim School
Mace
Completed Roy Conway
304 Exeter College Oxford Mace £1.25m April 16
Joinery including Panelling, Doors and Glazed Screens Ongoing
310 Big Data Institute Oxford
Mace £1.1m May 16 - Feb 17
Timber Panelling, Internal Doors & Bespoke Joinery Completed Phil Hilton - Project Director Liam Donoher Quantity Surveyor
313 New Marlborough School & Commercial Building Mace £ Feb 17
Joinery including Acoustic Panelling, Doors, Reception Desk & Washroom Fit-out Ongoing

Airport Projects

Ref Project Client Value Programme Scope of Works Status Contact
217 Gatwick Pier 1 Rokbuild Ltd 134K Apr 04-Nov 04 Carpentry & Joinery Fit Out Competed
226 Heathrow T5 Baggage Accommodation Mace £839K Oct 05-Nov 07 Fit Out Completed Tonya Sanni - Project Manager; Adam Cartright - Quantity Surveyor
235 Heathrow T5 - CIP Lounge Mace £1.84M Jan 07-May 08 Doors, Frames, General Joinery and Fit Out Completed Andrew Butterworth - Package Manager; Simon Hoarsley - Project Manager;Anthony Sexton - Commercial Manager
246 Heathrow T3 - Transformation Room Morgan Ashurst £52K Apr 08-Sep 08 General Builderswork & Fit Out Completed Alan Smith - Project Manager; Neil Reynolds - Quantity Surveyor
251 Heathrow T3 - Virgin COGS Morgan Ashurst £80K Nov 08-Jan 09 General Builderswork Completed Rob Liddle - Project Manager; Richard Hawkins - Quantity Surveyor
295 AOF Snowbase (Heathrow) Mace £159K Sep 14-May 15 Internal Joinery Completed Roshan Ratnapala - Project Manager, Charles Dupigny - Quantity Surveyor

Health Authority Projects

Ref Project Client Value Programme Scope of Works Status Contact
216 Broadmoor Hospital Crowthorne Costain £2.5M Mar 04-Apr 06 Doors, Frames, General Joinery and Roof Completed Gareth Williams - Project Manager - Left Costain; Paul Houlton - Quantity Surveyor
222 Queen Mary's Hospital Roehampton Bovis Lend Lease £2.11M Nov 04-Mar 06 Carpentry and Joinery Completed Chris Howcroft; Jonathan Lossyk
221 Diamond Laboratory Building Synchrotron - Didcot Costain £600K Jan 05-Apr 06 Doors, Frames and General Joinery Completed Dave Williams - Project Manager; Alan Kittles - Quantity Surveyor
225 ISIS Laboratory, Didcot Costain £205K Jan 06-Nov 06 Doors, Frames and General Joinery Completed Agency Manager; Alan Kittles - Quantity Surveyor
231 GlaxoSmithKline Laboratory Bovis Pharmaceutical £156K May-06 to General Builderswork Completed Paul Symes - Quantity Surveyor
236 Cancer Research Facility Oxford Mace Plus £2.39M Jan 07-Jan 08 General Builderswork, Carpentry, Joinery, Specialist Furniture Completed Warren Pickance - Project Manager; Kevin Pettipher - Quantity Surveyor
259 Broadmoor Hospital Quion Contracts/ Direct £5K Jul 09-Dec 09 Refurbishment Works Completed Simon Lowe - Project Manager
280 Chelsea & Westminster Hospital - Burns & Diagnostics Ward Mace £1.2M Oct 12-Aug 13 Doors, Frames Specialist & General Joinery Completed Darren Pope - Project Manager
287 Chelsea & Westminster Hospital - Adult Burns Ward Mace £352K Oct 13 - Feb 14 Internal fixtures, Fittings and Joinery Completed Darren Pope - Project Manager

Residential Projects

Ref Project Client Value Programme Scope of Works Status Contact
173 Red Square, London Ballymore £801K 2001-2002 Carpentry and Joinery Works Completed
168 Silverthorne Triangle Bovis Construction £1.2M 2001-2002 Carpentry and Joinery Works Completed
209 199 Knightsbridge, SW1 Brookfield Multiplex £7.8M 2003-2005 Doors, Frames, General Joinery to 207 Units Timber Decking and Staircases Completed Ryan Mitchell; Steve Brown - Quantity Surveyor
238 Regent Street, W1 Sir Robert McAlpine £950K Apr 07-Jul 08 Fit Out of 7 Units Completed Geoff Teeling; Nigel Chard
249 Abbey Mill House, Reading Galliford Try £811K Sep 08-Feb 09 Carpentry & Joinery Completed Jerry Simms - Project Manager; Daniel Fox - Quantity Surveyor
269 The White House Julian Mountain £595k Nov 10-Oct 11 Sub/Super structure, and complete fitout Completed Julian Mountain - Project Manager, Richard Tait-Quantity Surveyor
286B
Foyle's Residential
Mace
£800k
Nov 13 -
Doorsets, general joinery, WC fit out and flooring
Ongoing

291
Harpenden
Andy Scarlett

Mar 14 -
Superstructure and fit out
Ongoing

292
HMS Nelson, Portsmouth
Lend Lease
£470k
Nov 13- Jan 15
Internal Joinery
Completed
Ali Azir - Project Manager, Clive Brandon - Quantity Surveyor
293
Harpenden
Andy Scarlett

July 14 -
Superstructure and fit out
Ongoing

294
Ram Brewery
Brookfield Multiplex
£443k
July 14- Nov 14
Full relocation of Nano Brewery, Marketing Suite for residentials
Completed
Kevin Lock - Project Manager, Adam Moore - Quantity Surveyor
289 Surrey Lane Appartments Lendlease £695k
Nov 14-June 15
Doorsets, general joinery, WC fit out and timber decking
Completed John Trainer
302
The Glebe
Brookfield Multiplex





Retail Projects

Ref Project Client Value Programme Scope of Works Status Contact
122 John Lewis, Bluewater Bovis Land Lease £1.6M 2000-2002 Carpentry, Joinery, Builderwork and Toilet Fit Out Completed Phil Clarke - Project Manager; Mark Chennery - Quantity Surveyor
162 Lexus Showroom, Tunbridge Wells N/A £84K Nov 00-May 01 Carpentry and Joinery Works Completed
196 Croydon Centrale Shopping Village Bovis Land Lease £237K Jan 03-Jun 03 Toilet Fit Out Completed John Pryce - Design Manager; Stephen Dix - Quantity Surveyor
218 Westwood Cross Thanet Carillion £466K Aug 04-Feb 05 Carpentry, Joinery and Fit Out Completed Alistair Mitchell - Project Manager
219 Mercedes After Sales Centre Woking Carillion £90K Jul 04-Oct 04 Carpentry and Joinery Works Completed Steve Clarke - Quantity Surveyor
N/A Various Tesco, Safeway and Marks and Spencer Stores Various Contractors £75K-£175K N/A Carpentry and Joinery Works Completed Warren Pickance - Project Manager; Kevin Pettipher - Quantity Surveyor
264 Daniels Store - Windsor Galiford Try £55K Jan 11-Mar 11 Carpentry and Joinery Works Completed Colin Jones
276 Clarence Street Galiford Try £22.5K Jan 12-Feb 12 Carpentry and Joinery Works Completed Ray Willis
286A Foyle's Bookshop Mace £650K Nov 13- May 14 Doorsets, general joinery and WC fit out Completed Finlay O'Sullivan - Project Manager; Ian Cruikshank - Quantity Surveyor

General Building Projects

Ref Project Client Value Programme Scope of Works Status Contact
210 HWDC, Project Wand Langley Mowlem £1.62M Oct 01-Jun 02 Doors, Frames, General Joinery and Fit Out to New Post Office Main Distribution Centre Competed Richard Tindal - Project Manager
223 Worle Magistrates Courts Weston Super Mare Mowlem £555K Jul 05-Dec 05 Doors, Frames and General Joinery to New Courthouse Completed Richard Tindal - Project Manager; Toby Conroy - Quantity Surveyor
227 Bristol Magistrates Court Bristol Mowlem/Carillion £987K Feb 06-Apr 07 Doors, Frames and General Joinery to New Courthouse Completed Pat Duggan - Project Manager; Rob Wardlkow & Brian Boden - Quantity Surveyor
237 London Library, SW1 Mace Limited £610K Jan 07-Sep 07 Fit Out Works Completed Mark Johnson; Bob Mayer
245 Denham Depot, Middlesex Carillion Highways £114K Apr 08-Jun 08 Refurbishment Works Completed Dave Roberts
252 Service Depot M25 Leatherhead, Surrey Carillion £19K Jan 09-Feb 09 Refurbishment of Toilets Completed Dave Roberts - Project Manager; Steve Clarke - Quantity Surveyor
257 Service Depot M25 Sunbury, Middlesex Carillion £40K Jul 09-Sep 09 Toilet and Kitchen Fit Out Completed Dave Roberts - Project Manager; Steve Clarke - Quantity Surveyor
258 Service Depot M25 Blunts Farm, Essex Carillion £20K Jul 09-Sep 09 Kitchen Fit Out Completed Dave Roberts - Project Manager; Steve Clarke - Quantity Surveyor
268 Negative Earth Galliford Try £60K Jul 10-Sep 10 Doors Skirtings Window boards Completed Ray Willis - Project Manager, Neil Ware - Quantity Surveyor
272 Cherwell Valley Galliford Try £110K Apr 11-Sep 11 Doorsets, WC fit out, Kitchen Fitout, general joinery Completed Ray Willis - Project Manager, Ian Wren - Quantity Surveyor
284 Salfords Custody Suite Mace £340K Jul 13 - Sep 13
Timber & Metal Door Sets, General Joinery, Specialist Desks Completed David Rogerson - Project Manager, Oliver Stent - Project Surveyor
289 The Lyric Theatre - Hammersmith Mace £700k Apr 14- Jan 15 Doorsets, WC fit out, general joinery and flooring Completed Andy Griffiths - Project Manager; Matt Wright - Commercial Manager
300 South Bank Tower Mace £1.36m Aug 15 - Apr 16
Walnut Frames & Door Sets, Glazed Partitions, Window Reveals & Casings Completed Shaun Tate - Project Manager, Joseph Gilman - Project Surveyor

Listed Building Projects

Ref Project Client Value Programme Scope of Works Status Contact
113 Smithfield Market Taylor Woodrow £1.25M 1997-1998 Roof restoration/refurbishment Competed Pat Hannon
123 Fleet Street Kier £1.01M 2002-2003 Windows/Panelled Door refurbishment Completed Sarah Crosley
169 Finsbury Circus Bovis Lend Lease £1.5M 2006-2007 Listed façade refurbishment & new sliding windows Completed Andy Lee
131 St Johns Church Mowlem £101K 2003 Internal joinery refurbishment Completed John White
117 The Great Eastern Hotel Laing £5M 1998-1999 Internal joinery refurbishment Completed Disbanded
129 Guildford High Street Walter Lllewellyn £50K 2003 Listed façade & internal joinery refurbishment Completed David Fisher
126 Charterhouse School G & T Construction Management £214K 2003 Internal bedroom/dormitary joinery refurbishment Completed Andrew Healy
274 Hardinge Barracks Bovis Lend Lease £649K 2012-2013 External sash windows renovations and internal joinery Completed Mark Norton
277 Bodleian Library Mace £633K May 13- May 15 External Windows Renovations Completed Tim Court
281 Bodleian Library Mace £3M May 13- May 15 Timber Wall Panelling, Timber ceilings, Cabinetry, Skirtings, Meatal & Timber Door Sets, Lecture Theatre Fit Out Completed Tim Court
283 Hounslow Officers Mess Bovis Lend Lease £135K Apr 13-Sep 13 Strip-Out and Restoration Completed Mark Norton
290 Hounslow Officer's Mess Bovis Lend Lease £460K Jan 14- Jan 15 External sash window renovation and replacement Completed Mark Norton - Project Manager; Natalie Keogan - Quantity Surveyor
297 Hounslow Officers Mess Lend Lease £600K Nov 14- July 15 Internal joinery refurbishment Completed James Myers
312 Royal Opera House Rise £4.2m Jan 17 - Fit-out & Joinery Ongoing Joe Hacke - Project Director; Nigel Fellows - Quantity Surveyor

  • British Safety Council
  • Achilles
  • WCS
  • Timber Trade Federation
  • Timber Trade Federation Responsible Purchaser
  • SCSSilver
  • Contractors Health and Safety Assessment Scheme
  • IFC